2017 Project Archives

The Port Authority’s projects include capital projects on our Aerospace Center campus.

Image of the project
Image of the project

Horton Building Annex Painting
COMPLETE

One of the many upgrades to the Horton Building Annex was exterior power washing and painting. Coleman Painting was award the project.

Image of the project

Post 6 Entrance
COMPLETE

Improvements were made to the Post 6 Entrance that extended the roof of the compressor room to meet the warehouse of Bldg 4. Shumaker Construction was awarded this project.

Image of the project

Horton Building Annex Roof Replacement
COMPLETE

This project consisted of the replacement of roof sections HA-1, HA-2 and HA-3 on the Horton Building Annex. The project includes the removal of approximately 9,400 square feet of existing fully adhered EPDM roofing and replacing it with a new fully adhered EPDM Roofing System. Kalkreuth Roofing was awarded this contract.

Image of the project

Horton Building Annex HVAC Replacement
COMPLETE

This project consisted of the replacement of HVAC Units RTU-7, 8 and 9 on the Horton Building Annex. The project included the removal of three roof top hvac package units and replacing them with new units. Shaw Mechanical was awarded this contract.

Image of the project

2017 Storm Drain Repair
COMPLETE

A review of storm drains on campus revealed that 12 drains needed repair. Replacement of catch basins were included. Layton Excavating Inc was awarded this contract.

Image of the project

East Side Exit Lane Asphalt Repair
COMPLETE

This project consisted of the repair of the deteriorating asphalt on the east entrance exit lane. It was imparitive to complete the repairs before more damage is caused during the winter months. Armor Paving was awarded this contract.

Image of the project

Old Handicapped Parking Asphalt Removal
COMPLETE

This project consisted of the removal of the old handicapped parking lot located near the west entrance of the Boeing Building.

Image of the project

Roof Replacement Section C6 and E3
COMPLETE

This project consisted of the removal and replacement of roof sections C6 and E3 on the Boeing Building with a new EPDM Roofing System.

Image of the project

West Side Traffic Control Gates
COMPLETE

The purpose of this project was to control vehicle traffic on the west entrance coming from Aerospace Drive onto the COATC Campus. This project included the installation of two vertical pivot lift gate systems and road work.

Image of the project

North and West Parking Lot Seal and Striping
COMPLETE

The north and west parking lots have been sealed and striped. Xtreme Asphalt performed the work.

Image of the project

West Side Storm Drain Repair
COMPLETE

A review of storm drains on the west side of the campus revealed that 7 drains were in need of repair. Replacement of catch basins and pipeline was performed by Law General Contracting.

Image of the project

East Side Traffic Control Gates
COMPLETE

The purpose of this project was to control vehicle traffic on the east entrance coming off of James Parkway onto the COATC Campus. This project included the installation of two vertical pivot lift gate systems and a data communication tower. Steve Salyer Electric performed the work.