Available Sites & Buildings
The Port Authority offers ready-to-build sites that are workforce-ready too.
The Port Authority is an industrial land bank and industrial building bank for Licking County. The Central Ohio Aerospace & Technology Center is the 350-acre industrial campus owned by the Port Authority. The Port Authority also owns industrial property in Union Township, Licking County.
Need more detail? Just ask! The Port Authority is able to provide, electronically, any variety of topographical, site layout, GIS printouts, AutoCad data, geotechnical reports, and environmental reports.
Request a brochure, arrange a site tour, or ask a question to the Port Authority:
AVAILABLE BUILDINGS
Details are available for buildings owned by the Port Authority in Newark slated for redevelopment and a build-to-suit option in Heath.
15,230 s.f. Flex Space Building
A 15,230+/- sq. ft. flex space building called STEMFlex® is ready for immediate occupancy in Newark. The development includes an additional 8,500+/- sq. ft. adjacent and a site for building up to 48,500 sq. ft. Major groundswork and building improvements are part of the redevelopment. Tax incentives are in place to offset the tax burden of building improvements. The building is targeted to industry with STEM-skilled jobs.
- Finish to suit, expandable
- Drive-in doors, recessed dock feasible
- Fully-served with industrial utilities
- Light industrial zoning
- Tax abatement zone for improvements
8,500 s.f. Flex Space Building
A 8,500+/- sq. ft. flex space building called STEMFlex® has been redeveloped in Newark with immediate occupancy feasible. The development includes an additional 15,230+/- sq. ft. adjacent and a site for building up to 48,500 sq. ft. Groundswork and building improvements are part of the redevelopment. Tax incentives are inj place to offset the tax burden of building improvements. The building is targeted to industry with STEM-skilled jobs.
- Finish to suit
- Drive-in doors
- Fully-served with industrial utilities
- Light industrial zoning
- Tax abatement zone for improvements
1,750 s.f. Small Business Building
Building 125 is a 1,750+/- sq. ft. building available for lease with predicted occupancy by October 1, 2024. The space was formerly used for Air Force security and for brewery raw material storage. It is well-suited for a small industrial tenant.
- Ready to occupy
- Drive-in door
- Fully-served with industrial utilities
- Industrial zoning
- Short term lease options
4,500 s.f. Small Business Building
Building 106 is a 4,500+/- sq. ft. building available for lease with predicted occupancy by October 1, 2024. The clean production space was formerly used for Air Force technical orders and as a microbrewery. It is well-suited for a small industrial tenant.
- Ready to occupy
- Drive-in door
- Fully-served with industrial utilities
- Industrial zoning
- Short term lease options
20,000 s.f. Build-to-Suit Building
A build-to-suit 20,000+/- sq. ft. industrial building to be located on a 3+/- acre site on the South Campus is proposed. The development plan mimics one used on three nearby buildings.
- Customizable, build-to-suit
- Expandable to 40,000 s.f.
- Drive-in door and 2 recessed dock doors
- Fully-served with industrial utilities
- Heavy industry zoning
- 15-year, 100% tax abatement
AVAILABLE SITES
Details on the available property owned by the Port Authority. The land is for sale or lease for manufacturing facilities. Build-to-suit options are available. Broker protected.
35-Acre Rail-Served Site
100-Acre Manufacturing Site
Tour the 100-acre site at Seminary Ridge Business Park – Heath. This site has feasible rail access and offers redundant electric along with gas, water, and sewer. Rail service extension from the Ohio Central Railroad is being sought.
- Just 3 miles to I-70
- Ready-to-build
- M-2 — heavy industry zoning
- 15-year, 100% tax abatement pre-negotiated
65-Acre Rail-Served Site
60-Acre Dividable Site
Tour the 60-acre site at Seminary Ridge Business Park – Heath. This site offers redundant electric along with gas, water, and sewer. The site is divisible in sizes from four acres up to 60 acres.
- Just 3 miles to I-70
- Ready-to-build
- M-2 — heavy industry zoning
- 15-year, 100% tax abatement pre-negotiated